Our Blog
How do I require a factory to provide a complete dimensional inspection report for Swiss CNC parts?
Our team has seen buyers accept a single "PASS" stamp from a Swiss CNC factory, then discover out-of-tolerance parts on the line. That gap costs real money. To require a…

What Inspection Items and Sampling Plan Apply to Pre-Shipment Final Inspection (FQC/OQC) of Swiss CNC Parts?
Every week our team opens cartons of Swiss-turned parts before they ship. We still find dimension errors nobody flagged. Skipping this step turns good orders into costly claims. A proper…

How Often Should In-Process Quality Checks (IPQC) Be Performed During Swiss CNC Batch Production?
Our QC team has watched a Swiss CNC run drift out of spec in under an hour. One skipped checkpoint, and a whole pallet of parts turns into scrap. In…

What Should a First Article Inspection (FAI) Report Include for Swiss CNC Machined Parts?
Our shop once approved a Swiss-turned lot based on a thin FAI report. A missed thread callout led to a full line stoppage at the customer's plant. A complete FAI…

What Measuring Equipment Should a Factory Use to Inspect Swiss CNC Parts?
Every week our team fields the same question from Swiss CNC buyers: which measuring tools actually catch the defects that ruin a production run before it reaches your dock? A…

What Cpk Value Measures a Factory’s Process Capability, and What Range Is Acceptable for My Parts?
Every week our quality team hears the same question from US buyers: my supplier sent a Cpk number, but what does it mean for my parts? Cpk, or Process Capability…







